Thesis/IP
- CBM+/PHM effectiveness evaluation simulation system (failure prediction and health management effectiveness evaluation simulation system)
- High-performance, high-durability tires for light rail and safety-enhanced health monitoring system V1.0
- Railway distribution line safety monitoring system reliability verification system
- Data recording and analysis system at the testing stage to improve the reliability of unmanned vehicles
- Railway distribution line AI-based condition diagnosis system
- Railway distribution line risk/LCC analysis system
- Railway distribution line maintenance optimization and support system
- Railway Reliability, Availability, Maintainability, and Safety (RAMS) Monitoring System
- Railway Component Unit Development Phase Failure Data Collection, Analysis and Corrective Action System (FRACAS)
- Railroad vehicle maintenance rate analysis simulation
- Unmanned vehicle development stage failure data recording, analysis and corrective action system
- Railway Reliability, Availability, Maintainability, and Safety (RAMS) Analysis Solution
- NemoFitDist (distribution suitability evaluation)
- Wireless low-floor tram comprehensive reliability management system
- Unmanned Vehicle Development Stage Data Management System (DCACAS)
- Reliability growth management system based on unmanned vehicle configuration management
- Railroad Reliability, Availability, Maintainability, and Safety (RAMS) simulation program