KPA (Key Performance Indicators), such as Materiel Availability, Operational Availability, and KSA (Key System Attributes), such as Mission Reliability, Logistics Reliability, O&S cost, of a system change with the application of CBM+.
NemoSIMCBM+ predicts the KPAs and KSAs before and after the application of CBM+.
Introduction Video
Main Input/Output
Main Screen
PBS (Product Breakdown Structure)
System and the sub-item structure in hierarchy tree
The related failure and maintenance details
Mission Failure
Mission success/failure through FTA information
Return time duration in case of mission failure
PM (Preventive Maintenance)
PM intervals, PM tasks, PM duration, related items