Project
History
“Nemosys provides world-leading solutions for clients.”
2023-2022
2021-2020
2019-2018
- Development of Power Equipment Performance Evaluation Program(The Korean Society for Railway)
- Conduct railway related equipment/parts RAMS analysis research service(Korea Testing Laboratory)
- Performing SIL certification service for side bearing temperature monitoring device/steep safety valve(Korea Railroad Research Institute)
- The airport railway electric vehicles, Daegu Station, Daegu Station and Daegu Station(Hyundai Rotem)
- Multi-purpose unmanned vehicle operation and maintenance cost calculation service(Hyundai Rotem)
- Performing the task of the CBM+ Specialized Research Center for Weapons Systems(Hyundai Rotem/LIG Nex1)
- Content-only electrical equipment-II RAM-C and CBM+ Development(LIG Nex1)
- Divisional Artillery Radar CBM+ Development(LIG Nex1)
- Design for Reliability (DFR) and Life Cycle Cost (LCC) estimation SW cooperative development(LIG Nex1)
- Collaborative development of RAM-C and CBM+ for the second project to strengthen Baekdu reconnaissance aircraft system capabilities(Newbit Technology)
- Hydrogen electric tram demonstration project and comprehensive safety countermeasures technical statement preparation service(Hyundai Rotem)
- RAMS Analysis of Gas Insulated Switching (GIS) system in Stage 1 of Airport Railroad(Hyosung Heavy Industries)
- Data-based PBL performance indicator research service(LIG Nex1)
- Contract for consulting service for vehicle-on-board SW (Seowoo Construction Industry)
- MMS Project for 18 trains of Daegu Metropolitan Railroad KORAIL(Hyundai Rotem)
- Consulting on the optimal spares invetory for Norway K2 vehicles' export project(Hyundai Rotem)
- RAMS Design analysis of Integrated Semiconductor Transformer(Korea Testing Laboratory)
- RAMS analysis of articulation system in low-floor trams(Korea Testing Laboratory)
- RAMS analysis of automatic coupling and decoupling system in railway vehicles(Korea Testing Laboratory)
- RAMS analysis of electric door system in urban railway vehicles(Korea Testing Laboratory)
- 2020 KORAIL Jeolla line KTCS-2 onboard signalling system SA certification support service(Hyundai Rotem)
- Spare parts inventory optimization service for 192 cars of Singapore CR151 (Hyundai Rotem)
- Research planning for the replacement cycle of electronic parts of railway vehicles (KORAIL)
- Establishment of sensor data-based monitoring system for maritime surveillance radar (LIG Nex1)
- Technical service for performance and deterioration evaluation of on-board signal system for trains in Airport Railroad(Airport Railroad)
- Risk analysis of modification change of on-board detection system in ITX(intercity train express)-Saemaeul trains(Hyunwoo System)
- Design verification and risk analysis for 48 train-vehicles of Seoul Metro Line 9 (Hyundai Rotem)
- Joint Supply and Demand Standard Agreement on the Development of On-Board Signalling System RAMS for Trains(Airport Railroad)
- National R/D Project Agreement for Development of Safety Monitoring Technology for Railway Powet Distribution Lines(Korea Agency for Infrastructure Technology Advancement)
- NemoSIM 4G,4R S/W Provision(Newbit Technology)
- National R/D Project Agreement for Development of PHM Technology for Rubber Tires of Light Rail Metro Vehicles(Korea Agency for Infrastructure Technology Advancement)
- NemoSIM 4G S/W Provision(Agency for Defense Development )
- Joint Research Agreement on Railway Vehicle Operation/Safety Improvement (Korea Agency for Infrastructure Technology Advancement)
- National R/D Project Agreement for Integrated Technology Management of Unmanned Aerial Vehicles(Korea Testing Laboratory)
- Construction of the Next Generation Integrated Information System for Airport Railroad (Airport Railroad)
- Korail Overseas Business RAMS Business Partnership Business Agreement(Korea Railroad Corporation)
- National R/D Project Agreement for the Development of RAMS Technology for High-Speed Rail Parts Equipment(Korea Agency for Infrastructure Technology Advancement)
- RAMS Simulation Joint DevelopmentAgreement with LIG Nex1(LIG Nex1)