RAMS simulation
system : NemoSIMCBM+

sub06_title
KPA (Key Performance Indicators), such as Materiel Availability, Operational Availability, and KSA (Key System Attributes), such as Mission Reliability, Logistics Reliability, O&S cost, of a system change with the application of CBM+.

NemoSIMCBM+ predicts the KPAs and KSAs before and after the application of CBM+.

Introduction Video

Main Input/Output

CBM+ 주요 입/출력

Main Screen

PBS
PBS (Product Breakdown Structure)
  • System and the sub-item structure in hierarchy tree
  • The related failure and maintenance details
임무고장
Mission Failure
  • Mission success/failure through FTA information
  • Return time duration in case of mission failure
예방정비
PM (Preventive Maintenance)
  • PM intervals, PM tasks, PM duration, related items
  • PM schedule smoothing
수리부속 재고 정책
Spare Inventory Policy
  • Inventory (s,S) policy per supply depot
  • Item failure rate, turnaround time-based optimal inventory size
top_icon